North East railway line

North East (SG)
Overview
StatusOperational passenger services from Southern Cross to Albury and Sydney
Owner
LocaleVictoria, Australia
Termini
Connecting lines
Former connectionsUpfield—Somerton link
Stations6 current stations
Service
TypeVictorian railway line
ServicesAlbury Southern
Spirit of Progress, Southern Aurora, Sydney–Melbourne Express, Intercapital Daylight
Shared tracks:
South Kensington–West Footscray, Albion–Jacana, Albury
Operator(s)
History
CommencedNovember 1959 (1959-11)
Opened
  • Southern Cross to Albury on 3 January 1962 (1962-01-03)
Completed3 January 1962 (1962-01-03)
ReopenedNew Wodonga section on 23 July 2010 (2010-07-23)
ClosedOld Wodonga section on 9 November 2008 (2008-11-09)
Technical
Number of tracksDouble track:
  • Southern Cross to Tottenham
  • Seymour to border

Single track:

  • Tottenham to Seymour
  • border to Albury
Track gauge4 ft 8+12 in (1,435 mm)
Route map

km
Multiple lines
via Flinders Street
1.2
Southern Cross
Melbourne Freight Terminal
City Loop | Webb Dock line (dismantled)
Victoria Dock (North wharf)
(demolished)
Melbourne Yard & Steel Terminal | Victoria Dock (old)
(all demolished)
CityLink | Victoria Dock (Westgate)
Appleton Dock
South Dynon | Swanson Dock
North Dynon
tunnel under Bunbury Street
Whitehall Street
Multiple lines
to Southern Cross or Flinders Street
6.9
Footscray
7.8
Middle Footscray
8.3
8.6
West Footscray
10.3
Tottenham
10.4
Ashley Street
11.0
White City
(demolished)
Maidstone
(demolished)
12.2
13.5
Sunshine
13.6
Hampshire Road
Multiple lines
via Deer Park
13.3
Anderson Road
13.7
Albion
Albion–Jacana section
13.8
Albion Loop
14.2
15.4
McIntyre Road
16.0
McIntyre Sidings | McIntyre Loop
17.6
18.8
Keilor Park Drive
19.8
Albistore Siding
(demolished)
20.3
Keilor East
(proposed)
22.2
Tullamarine Loop
23.5
24.1
26.4
26.5
Jacana
26.5
27.0
Jacana Loop
27.6
Camp Road
27.9
Broadmeadows
Broadstore Siding
(demolished)
30.3
Coolaroo
32.7
Somerton Road
32.8
Somerton
(demolished)
33.1
Somerton Yard | Roxburgh Park
37.1
Craigieburn
37.4
38.5
end of overhead
38.5
40.8
end of Metro area
Seymour section
44.2
Donnybrook
52.8
Beveridge
58.5
Wallan
61.7
Lightwood
(demolished)
64.5
Heathcote Junction
66.3
Wandong
67.8
69.7
Mathieson's Siding
(demolished)
74.5
Kilmore East
77.0
Kilmore East Quarry Siding
86.2
Broadford
88.3
McDougall's Siding
(demolished)
96.7
Lowry's Siding
(demolished)
99.5
101.2
Tallarook
105.5
Dysart
107.4
109.7
Seymour
117.9
Gravelside Siding
(demolished)
120.4
Mangalore
(demolished)
Albury section
127.0
Avenel
132.3
Monea
(demolished)
138.6
Locksley
(demolished)
147.3
Longwood
(demolished)
154.3
Creighton
(demolished)
162.1
Euroa
169.9
Balmattum
(demolished)
180.4
Violet Town
186.8
Burkes Hill Siding
(demolished)
194.2
Baddaginnie
(demolished)
202.9
Hanson's Siding
(demolished)
206.3
Benalla
Tatong line
to Tatong
(dismantled) |
Oaklands line
to Oaklands
215.8
Winton
(demolished)
222.0
Head's Siding
(demolished)
229.8
Glenrowan
(closed)
244.1
Alumatta Siding
(demolished)
Whitfield line
to Whitfield
(dismantled)
245.0
Wangaratta
250.9
Bowser
(demolished)
Yackandandah line
to Yackandandah
|
Peechelba East line
to Peechelba East
(dismantled)
268.6
Springhurst
Wahgunyah line
to Wahgunyah
(dismantled)
279.4
Barambogie Ballast Siding
(demolished)
282.4
Chiltern
291.2
Barnawartha
(closed)
SCT Barnawartha
303.3
West Wodonga
(demolished)
310.2
Wodonga
311.8
Wodonga (old)
(closed)
Cudgewa line
to Cudgewa
(dismantled)
313.1
Wodonga Coal Siding
(demolished)
313.8
Bridge over Murray River
NSW
Victoria
border
315.9
Albury
km

North East (original BG line)
Overview
Other name(s)Albury
Status
  • Operational with broad gauge passenger services from Flinders Street to Seymour
  • Gauge converted beyond Seymour
Owner
LocaleVictoria, Australia
Termini
Connecting lines
Former connections
Stations
  • 38 current stations
  • 13 former stations
  • 2 current siding
  • 13 former sidings
Service
TypeVictorian railway line
ServicesAlbury Craigieburn Seymour Shepparton
Operator(s)
History
Commenced21 October 1860 (1860-10-21)
Opened
  • Southern Cross to North Melbourne on 17 January 1859 (1859-01-17)
  • North Melbourne to Essendon on 21 October 1860 (1860-10-21)
  • Essendon to Dysart on 18 April 1872 (1872-04-18)
  • Dysart to Seymour on 26 August 1872 (1872-08-26)
  • Seymour to Longwood on 20 November 1872 (1872-11-20)
  • Longwood to Violet Town on 20 March 1873 (1873-03-20)
  • Violet Town to Benalla on 18 August 1873 (1873-08-18)
  • Benalla to Wangaratta on 28 October 1873 (1873-10-28)
  • Wangaratta to Wodonga on 21 November 1873 (1873-11-21)
  • Wodonga to Albury on 14 June 1883 (1883-06-14)
  • Flinders Street to Southern Cross on 29 November 1891 (1891-11-29)
Completed14 June 1883 (1883-06-14)
Reopened
  • North Melbourne to Newmarket on 31 October 1867 (1867-10-31)
  • Newmarket to Essendon on 9 January 1871 (1871-01-09)
Electrified
  • Flinders Street to Essendon on 28 May 1919 (1919-05-28)
  • Essendon to Broadmeadows on 4 September 1921 (1921-09-04)
  • Broadmeadows to Craigieburn on 22 July 2007 (2007-07-22)
Gauge convertedSeymour to Albury on 23 July 2010 (2010-07-23)
Closed
  • North Melbourne to Essendon on 1 July 1864 (1864-07-01)
  • Seymour to Albury on 9 November 2008 (2008-11-09)
Technical
Line length307.812 km (191.27 mi)
Number of tracksBroad gauge
  • Six tracks: Flinders Street to North Melbourne
  • Four tracks: North Melbourne to Kensington
  • Double track: Kensington to Dysart
  • Single track: Dysart to Seymour

Standard gauge
Double track:

  • Seymour to border

Single track:

  • Broadmeadows to Seymour
  • border to Albury
Track gauge
  • 5 ft 3 in (1,600 mm)
  • 4 ft 8+12 in (1,435 mm)
ElectrificationFlinders Street to Craigieburn: 1500 V DC overhead
Operating speed
  • 130 km/h (81 mph) - Passenger
  • 115 km/h (71 mph) - Freight
Signalling
Maximum incline1 in 50 (2%)
Route map

km
Multiple lines
via Richmond or Jolimont
0.0
Flinders Street
1.4
Parliament
2.7
Melbourne Central
3.3
Flagstaff
1.2
Southern Cross
2.9
North Melbourne
3.1
Dynon Road
3.7
3.7
Multiple lines
via Footscray
Metro section
(Craigieburn Line)
5.4
Racecourse Road
5.5
Newmarket
6.8
Ascot Vale Road
7.0
Ascot Vale
7.4
8.1
Moonee Ponds
9.2
Essendon
9.5
10.4
Glenbervie
11.0
Strathmore
11.3
11.7
11.8
11.9
12.5
Pascoe Vale
14.1
Oak Park
15.6
Glenroy
16.7
Jacana
16.7
17.8
Camp Road
18.1
Broadmeadows
Broadstore Siding
(demolished)
20.5
Coolaroo
22.9
Somerton Road
23.0
Somerton
(demolished)
23.3
Somerton Yard | Roxburgh Park
27.3
Craigieburn
27.6
28.0
end of overhead
28.7
31.0
end of Metro area
Seymour section
34.4
Donnybrook
43.0
Beveridge
48.7
Wallan
51.9
Lightwood
(demolished)
54.7
Heathcote Junction
56.5
Wandong
58.0
59.9
Mathieson's Siding
(demolished)
64.7
Kilmore East
67.2
Kilmore East Quarry Siding
76.4
Broadford
78.5
McDougall's Siding
(demolished)
86.9
Lowry's Siding
(demolished)
89.7
91.4
Tallarook
95.7
Dysart
97.6
99.9
Seymour
108.1
Gravelside Siding
(demolished)
110.6
Mangalore
(demolished)
117.2
Avenel
122.4
Monea
(demolished)
128.8
Locksley
(demolished)
137.5
Longwood
(demolished)
144.5
Creighton
(demolished)
152.3
Euroa
160.1
Balmattum
(demolished)
170.6
Violet Town
177.0
Burkes Hill Siding
(demolished)
184.4
Baddaginnie
(demolished)
193.1
Hanson's Siding
(demolished)
196.5
Benalla
Tatong line
to Tatong
(dismantled) |
Oaklands line
to Oaklands
206.0
Winton
(demolished)
212.2
Head's Siding
(demolished)
220.0
Glenrowan
(closed)
234.3
Alumatta Siding
(demolished)
Whitfield line
to Whitfield
(dismantled)
235.2
Wangaratta
241.1
Bowser
(demolished)
Yackandandah line
to Yackandandah
|
Peechelba East line
to Peechelba East
(dismantled)
258.8
Springhurst
Wahgunyah line
to Wahgunyah
(dismantled)
269.6
Barambogie Ballast Siding
(demolished)
272.6
Chiltern
281.4
Barnawartha
(closed)
293.5
West Wodonga
(demolished)
300.4
Wodonga
302.0
Wodonga (old)
(closed)
Cudgewa line
to Cudgewa
(dismantled)
303.3
Wodonga Coal Siding
(demolished)
304.0
Bridge over Murray River
NSW
Victoria
border
306.1
Albury
km

2.6

The North East railway line is a railway line in Victoria, Australia. The line runs from Southern Cross railway station on the western edge of the Melbourne central business district to Albury railway station in the border settlement of Albury-Wodonga, serving the cities of Wangaratta and Seymour, and smaller towns in northeastern Victoria.

The railway line is both standard gauge and broad gauge. It originally was built as broad gauge the entire length, but another track was built as standard gauge between Seymour and Albury, with construction of the standard gauge track commencing in November 1959 and completed in January 1962, completing the Sydney-Melbourne standard gauge railway. Between 2008 and 2010, the broad gauge track between Seymour and Albury was finally converted to be the line's second standard gauge track. The original section between Southern Cross and Jacana remains broad gauge, with the standard gauge joining and running parallel to the broad gauge between Jacana and Seymour, where the broad gauge branches off on the Tocumwal line, and finally continuing as standard gauge all the way to Albury.

The line is owned by VicTrack, but the standard gauge sections are leased to and maintained by the Australian Rail Track Corporation.