Line 2 (Shaoxing Metro)
| Line 2 | |
|---|---|
| 2 | |
Line 2 train at Tandu station | |
| Overview | |
| Status | Operational |
| Locale | Shaoxing, Zhejiang, China |
| Termini |
|
| Stations | 9 |
| Service | |
| Type | Rapid transit |
| System | Shaoxing Metro |
| Operator(s) | Shaoxing Metro Corporation |
| Rolling stock | PM201 |
| History | |
| Opened | 26 July 2023 |
| Technical | |
| Line length | 10.55 km (6.56 mi) |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 100 km/h (62 mph) |
Line 2 of Shaoxing Metro (Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, Zhejiang Province, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations.
Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan. Construction started on 1 March 2020, and the line was officially opened for operation on 26 July 2023. The line uses 4-car trains initially and would have mixed operations of 4 and 6-car trains in the long term.