Bommasandra metro station
Delta Electronics Bommasandra | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Namma Metro station | |||||||||||
Final stages of this metro station as of April 2024 | |||||||||||
| General information | |||||||||||
| Location | Bommasandra Industrial Area, Bommasandra, Karnataka 560099 | ||||||||||
| Coordinates | 12°49′10″N 77°41′18″E / 12.81933°N 77.68834°E | ||||||||||
| Owned by | Namma Metro | ||||||||||
| Operated by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||||||||
| Line(s) | Yellow Line | ||||||||||
| Platforms | Side platform Platform-1 → Rashtreeya Vidyalaya Road Platform-2 → Train terminates here | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | Heelalige railway station | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Platform levels | 2 (TBC) | ||||||||||
| Parking | (TBC) | ||||||||||
| Accessible | (TBC) | ||||||||||
| Architect | ITD - ITD Cementation India JV | ||||||||||
| Other information | |||||||||||
| Status | Awaiting trainsets and ready for operations | ||||||||||
| Station code | (TBC) | ||||||||||
| History | |||||||||||
| Opening | August 2025 (TBC) | ||||||||||
| Electrified | 750 V DC third rail | ||||||||||
| Previous names | Bommasandra | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Delta Electronics Bommasandra (formerly known as Bommasandra) is the upcoming elevated southern-east terminal metro station on the Yellow Line of the Namma Metro serving the Bommasandra neighbourhood in Bengaluru with its industrial area and Heelalige railway station connected in this area. The station was named after a renowned electronics company located nearby after an agreement with BMRCL.
As per latest reports, the Yellow Line is slated to be operational around August 2025 instead of May 2025 which was announced by the Namma Metro Managing Director, Maheshwar Rao, previously mentioned by Karnataka Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar and with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.