Oasia Hotel Downtown

Oasia Hotel Downtown
General information
StatusCompleted
Type
  • Mixed-use
  • Office
  • Hotel
LocationTanjong Pagar, Central Business District, Singapore
Address100 Peck Seah St, Singapore 079333
Coordinates1°16′33″N 103°50′31″E / 1.2758°N 103.8420°E / 1.2758; 103.8420
Construction started2012
Completed2016
Cost$138 million
OwnerFar East Organization
Height
Top floor193.3 m (634 ft)
Technical details
Floor count27
Floor area19,416 m2 (208,990 sq ft)
Lifts/elevators13
Design and construction
Architect(s)WOHA
EngineerKTP Consultants Private Limited
Services engineerRankine&Hill (S) Private Limited
Main contractorWoh Hup Pte Ltd

Oasia Hotel Downtown is a 27-story mixed-use hotel and office skyscraper in the Downtown Core district of Singapore. Its exterior includes 21 species of climbing plants on its facade. The building's exterior, constructed atop vertical grid panels, will appear more "furry" over time, with only specks of its orange, pink and maroon aluminium mesh exterior remaining visible. About 40 percent of the building's volume consists of communal green space elevated vertically into the skyscraper.

The building was designed by the architectural firm WOHA and developed by the Far East Organization. It opened in April 2016. It received the 2018 award for "Best Tall Building in the World" from the Council on Tall Buildings and Urban Habitat.