Line M101 (Beijing Subway)
| Line M101 | |
|---|---|
Construction site of Beijing Dajuyuan station | |
| Overview | |
| Status | Under construction |
| Locale | Tongzhou district Beijing |
| Termini |
|
| Stations | 14 |
| Service | |
| Type | Rapid Transit |
| System | Beijing Subway |
| Operator(s) | Beijing MTR Corp. Ltd. |
| Depot(s) | Fuhaocun |
| Rolling stock | 3 car Type A, reservations for 3+3 car Type A in the future |
| History | |
| Planned opening | 2027 (planned) |
| Technical | |
| Line length | 18.1 km (11.2 mi) |
| Character | Underground |
| Operating speed | 100 km/h (62 mph) |
Line M101 of the Beijing Subway (Chinese: 北京地铁M101线; pinyin: Běijīng Dìtiě M101 Xiàn) is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan to Zhangjiawandong. It is fully underground. It is scheduled to open in 2027. The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.