Lincoln Gap Wind Farm

Lincoln Gap Wind Farm
CountryAustralia
Location15 km west of Port Augusta on the Eyre Highway at Lincoln Gap, Eyre Peninsula, South Australia
Coordinates32°37′08″S 137°34′48″E / 32.619°S 137.580°E / -32.619; 137.580
StatusUnder construction
Construction began2017
Commission dateExpected mid-2019
Construction costA$300M (stage 1)
A$170M (stage 2)
OwnerNexif Energy Australia
Wind farm
TypeOnshore
Hub height110 metres (361 ft)
Rotor diameter136 metres (446 ft)
140 metres (459 ft)
Rated wind speed
  • 11 m/s (36 ft/s)
Power generation
Units operational
Make and modelSenvion 3.6M140 EBC
Vestas V136
Units planned42 × 6 MW
Nameplate capacity212 MW
Capacity factor43%
Annual net output800 GW·h
Storage capacity10 MW·h
External links
Websitelincolngapwindfarm.com.au

The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.

Following Senvion's European parent company commencing insolvency proceedings, Vestas was engaged to provide maintenance services for the 126 MW first stage, and the 24 3.6 MW turbines for the second stage. The 212 MW wind farm reached full generation capacity in late April 2022.