Legacy Trail (Florida)

Legacy Trail
Legacy Trail near State Road 681 overpass
Length18.5 miles (29.8 km)
LocationSarasota County, Florida
EstablishedDecember 21, 2004
Trailheads
UseShared-use for walking and cycling
SeasonYear round
MonthsYear round
SightsPayne Park, Oscar Scherer State Park, Venice Train Depot
HazardsWeather, at-grade pedestrian crossing at vehicular thoroughfares
SurfaceAsphalt
Right of waySeminole Gulf Railway
Maintained bySarasota County
Websitescgov.net/LegacyTrail
Trail map
Legacy Trail highlighted in green

The Legacy Trail is an 18.5-mile (29.8 km) multi-use recreational rail trail connecting Sarasota and Venice, Florida. It runs along a former portion of the Seminole Gulf Railway corridor (most of which was originally a Seaboard Air Line Railroad corridor). The trail runs from the Historic Venice Train Depot to Fruitville Road in Sarasota. The original segment of the trail from Venice to Palmer Ranch opened in 2008 and it was extended to downtown Sarasota in 2022.