Guicam Bridge

Guicam Bridge

Tulay ng Guicam
Coordinates7°26′10″N 122°50′16″E / 7.4359778°N 122.837814°E / 7.4359778; 122.837814
Carries2 lanes of Lutiman-Guicam-Olutanga Road; Pedestrians and vehicles
CrossesCanalizo Strait
LocaleAlicia and Mabuhay, Zamboanga Sibugay
Named forBarangay Guicam in Alicia, Zamboanga Sibugay
Maintained byDepartment of Public Works and Highways
Characteristics
DesignGirder bridge
Total length1.2 km (0.75 mi)
Longest span540.80 m (1,774.3 ft)
Clearance above14.8 km (9.2 mi)
No. of lanesTwo-lane single carriageway
History
Construction start29 January 2021
Construction costPH₱ 1.06 billion
Location

The Guicam Bridge is a under construction 1.2 km (0.75 mi) concrete girder bridge between the towns of Alicia and Mabuhay in Zamboanga Sibugay, Philippines. The bridge will connect Olutanga Island and its three municipalities of Mabuhay, Talusan, and Olutanga with the rest of Mindanao Island, which are separated by the Canalizo Strait.