Caleido
| Caleido | |
|---|---|
Caleido in June 2021 | |
| Etymology | καλός (kalós), beautiful, and εἶδος (éidos), image |
| General information | |
| Status | Completed |
| Address | Paseo de la Castellana, 259-E |
| Town or city | Madrid |
| Country | Spain |
| Construction started | April 2017 |
| Estimated completion | 3 October 2021 |
| Cost | 240 million € |
| Owner | Grupo Villar Mir Megaworld Corporation |
| Height | |
| Architectural | 173 meters (568 ft) |
| Technical details | |
| Floor count | 36 |
| Floor area | 70,000 m2 (750,000 sq ft) |
| Grounds | 33,325 m2 (358,710 sq ft) |
| Design and construction | |
| Architecture firm | Fenwick Iribarren Serrano-Suñer Arquitectura |
| Developer | Obrascón Huarte Lain |
| Website | |
| Official website | |
| References | |
Caleido is a 173-metre-tall (568 ft), 36-story skyscraper located in Madrid. It is popularly known as the Quinta Torre (Fifth Tower), as it stands near the other four skyscrapers of the Cuatro Torres Business Area (CTBA) complex along the Paseo de la Castellana. As of 2021, IE University is the main tenant.
Construction began in April 2017 and the tower was formally completed on 19 October 2021. The original completion date was September 2020, but it was delayed due to the COVID-19 pandemic.
The building occupies the former site of the Centro Internacional de Convenciones de la Ciudad de Madrid. It is the fifth tallest building in Madrid and the seventh tallest in Spain.
Caleido was designed by the architectural firms Fenwick Iribarren and Serrano-Suñer Arquitectura. The main contractor was OHL Desarrollos.