Buffalo Gap Wind Farm
| Buffalo Gap Wind Farm | |
|---|---|
| Official name | Buffalo Gap Wind Farm |
| Country | United States |
| Location | 20 miles (30 km) south west of Abilene, Texas |
| Coordinates | 32°18′38″N 100°8′57″W / 32.31056°N 100.14917°W |
| Status | Operational |
| Commission date |
|
| Owner | AES Wind Generation |
| Wind farm | |
| Type | Onshore |
| Power generation | |
| Units operational | 296 turbines |
| Make and model | Vestas V80-1.8 MW, GE SLE-1.5 MW, Siemens SWT-2.3 MW |
| Nameplate capacity | 523.3 MW |
| Capacity factor | 33.3% (average 2010-2017) |
| Annual net output | 1,529 GW·h |
The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about 20 miles (30 km) south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 523.3 megawatts (MW).