A2 motorway (Serbia)
| Autoput A 2 | ||||
|---|---|---|---|---|
| Serbian: Autoput A2 Serbian Cyrillic: Аутопут А2 | ||||
| Miloš the Great Motorway | ||||
| Route information | ||||
| Part of E761 E763 | ||||
| Maintained by JP "Putevi Srbije" | ||||
| Length | 131.322 km (81.600 mi) 18.783 km (12 mi) under construction 106.806 km (66 mi) planned | |||
| Major junctions | ||||
| From | Belgrade | |||
| 26 at Obrenovac 23 at Požega | ||||
| To | Boljare border crossing | |||
| Location | ||||
| Country | Serbia | |||
| Major cities | Belgrade, Obrenovac, Gornji Milanovac, Čačak, Požega, | |||
| Highway system | ||||
| ||||
The A2 motorway (Serbian: Аутопут А2, Autoput A2), called the Miloš the Great Motorway (Serbian: Аутопут Милош Велики, Autoput Miloš Veliki) is a motorway in Serbia under construction. When complete, it will span 257 kilometers (160 mi). It begins in Belgrade and runs southward to Čačak and Požega, then going further south towards Montenegro ending at the future Boljare border crossing.
This motorway will provide a faster route to Montenegro by linking to the Bar-Boljare motorway, currently under construction. It is frequently referred in Serbian media as part of proposed Corridor XI (Serbian: Коридор 11, Koridor XI) - an envisioned ferry/motorway corridor linking Bari (Italy), Bar (Montenegro), Belgrade (Serbia) and Bucharest (Romania).